Every arrival.
In view.
A single operational picture of cargo, exceptions and the decisions between.
Updated arrival estimate conflicts with the assigned berth window. Review a proposed adjustment before any schedule changes.
A single operational picture of cargo, exceptions and the decisions between.
Updated arrival estimate conflicts with the assigned berth window. Review a proposed adjustment before any schedule changes.
Portline / Maritime logistics
A port-operations control tower that triages late containers and recommends accountable next actions.
Dispatch teams monitor schedules across fragmented systems and spend their highest-pressure hours chasing status updates rather than resolving bottlenecks.
Dense, keyboard-friendly table views use consistent urgency signals; an adjacent agent panel explains each recommendation and cites the demo fields that triggered it.
React, TypeScript, TanStack Table, FastAPI, PostgreSQL, Redis jobs and event-sourced audit logs. Fictional shipment records and delay reasons only. This architecture is a proposal, not a deployed backend.
Data-rich, utilitarian, nocturnal / navy with coral alerts. Introduce an evidence drawer with priority rationale, timeline and an explicit approval gate.
Synthetic research: 6 fictional dispatcher interviews, 12 modeled triage tasks. This is a fictional scenario: no real interviews or measured outcomes are claimed.
Keyboard-operable controls, visible focus, readable content and responsive reflow support this concept. Reduced-motion preferences remove animated scrolling. Physical-device and assistive-technology validation remain future work.
Prioritize exceptions by downstream consequence; test information density with dispatch tasks; design side-by-side before/after triage states. AI-assisted implementation is used for prototyping and iteration; product recommendations here are deterministic local simulations.
Conflicting ETAs surface as a conflict, not a consolidated fact. An agent cannot notify a carrier or reroute cargo without dispatcher approval. The next step is real user research, production data validation and accessibility testing before any launch.
Core views: Arrivals control tower → Exception evidence drawer → Approval and audit timeline